TUTORIAL: Getting started with Seismon

Stefan Mertl


27.7.2010


Table of Contents

1. Introduction
1.1. The tutorial dataset
2. Setting up the database user
3. Setting up the project
4. Building the geometry
5. Visualizing the geometry
6. Importing waveform data
7. Applying the geometry to the waveform data
8. Visualizing the waveform data

List of Figures

2.1. Select the create new user menu.
2.2. Fill in the values in the create new database user dialog.
3.1. Select the new project menu.
3.2. The create a new project dialog.
3.3. The database login dialog.
3.4. The Seismon main window after the project has been created.
4.1. Select the collection ↦ new menu in the context menu.
4.2. Fill in the name of the new collection.
4.3. The newly created collection named geometry.
4.4. Select the geometry category.
4.5. Adding the Edit Units Database module to the collection.
4.6. Adding the Edit Stations Database module to the collection.
4.7. The collection with the two geometry modules.
4.8. Execute the Edit Units Database module.
4.9. The Edit Units Database dialog.
4.10. Select the import csv menu.
4.11. Select the unitsImport.suf file.
4.12. The imported units appear in the dialog window.
4.13. Close the Edit Units Database dialog window.
4.14. Execute the Edit Stations Database module.
4.15. The Edit Stations Database dialog window.
4.16. Select the import csv menu.
4.17. Select the stationsImport.ssf file.
4.18. The imported units appear in the dialog window.
4.19. Close the Edit Units Database dialog window.
5.1. Add the module view geometry in google earth to the geometry collection.
5.2. Execute the collection.
5.3. The collection execution status.
5.4. The tutorial geometry visualized in Google Earth.
6.1. Select the menu Project ↦ add waveform directory.
6.2. Select the waveform directory.
6.3. Create a new collection.
6.4. Enter the collection name.
6.5. Select the File Import category.
6.6. Add the MiniSeed import module.
6.7. Edit the MiniSeed import module.
6.8. The MiniSeed import edit dialog window.
6.9. Select the add directory menu.
6.10. Specify the filename pattern.
6.11. Select the convertedRaw folder.
6.12. The selected files appear in the input files listbox.
6.13. Execute the collection by clicking the execute button (marked with the red rectangle).
6.14. Execution status bar.
6.15. Collection execution status.
6.16. tutorial01_traceheader example
7.1. Load a collection.
7.2. Select the geometry collection.
7.3. The geometry collection is loaded.
7.4. Select the last module in the collection.
7.5. Add the Apply Geometry module to the collection.
7.6.
7.7. Disable the view geometry in google earth module.
8.1. Add the modules to the trace display collection.
8.2. The load from database edit dialog window.
8.3. The load from database edit dialog after selecting the stations and channels.
8.4. The tracedisplay after the first execution of the collection.
8.5. The event at 15:10:05 displayed in the tracedisplay window.